top of page
Search
  • Writer's picture3DSDS

ALL IN A DAYS WORK

Updated: Apr 3, 2019

Mezzanine Floor Construction Drawings.

Gaining extra floor space from your current space can be more cost effective and less disruptive than moving to new premises, plus it can increase the value of your building.


The first headache is getting it designed with plans that are structurally sound with all the construction details.


Finding a reliable, experienced engineer, can take this headache away.


With an accurate brief of what is required, 3DSDS, can develop a design to suite your requirements in around a day, subject to size.


The above illustrations show a 30 x 18m Mezzanine Floor design, fully detailed with columns, bracing, connections, floor grating plus stairs and railings.


That is an extra 540 square meters of new space.


The finished package of deliverables would include, General Arrangement Drawings, Assemblies and Part Drawings, and yes, this was all done in a day.


Extra useful deliverables could be: -

o BOMs (Bill of Materials).

o NC Files.

o Custom configured drawings.

o Structural Calculations for an appointed Professional Indemnity Engineer to check and certify.


With the right people doing the work, designs for your new space, could be ready quicker than you might have thought possible.


For more information please call +44 (0) 78 0101 0100 or email enquiries@3dsds.co.uk

54 views0 comments

Recent Posts

See All
bottom of page